How to build an acceptance checklist from a recorded demo
Project verification

How to build an acceptance checklist from a recorded demo

Turn a product demo into an acceptance checklist with conditions, actions, expected results and evidence. A worked example based on agreed requirements.

The Transkribator team5-minute read
SOURCEACCEPTANCE TESTINGSubmit the formPhone number entered?Yes → request andconfirmationNo → field messageFROM WORDS TO RESULTS
Working from a real recordingWorked training exampleTemplate to copy
Project verification

A successful demo covers only the scenarios it shows

On the call, the form appeared to submit the request correctly. The demo might not have covered a different role, a repeated submission or a missing required field. A recording shows what happened during the demo. Other scenarios still need testing.

Build the acceptance checklist from requirements agreed in advance. A viewer’s new idea may be valuable, but record it separately. Otherwise, the scope can shift during acceptance and people end up discussing different versions of the task.

Steps

Prepare the checks from the recording

  1. Record the version and conditions

    Note the version or build, who demonstrated it and which role they used. Describe the test data and environment in enough detail for someone else to repeat the scenario. Flag any unknown conditions.

  2. Link each check to a requirement

    Take the agreed behavior and find the relevant point in the recording. One demonstration can cover multiple checks, but each needs its own expected result. Add a “not tested” item for any required behavior that was not shown.

  3. State the action and expected result

    Replace “check the form” with the data to enter, the control to click and the result to expect. Specify the expected response to invalid input. Keep new edge cases outside the acceptance checklist unless they fall within the agreed scope.

  4. Run the checks again

    Run the scenarios on the agreed version, record what happened and attach evidence. Use distinct statuses for failures, blocked checks and missing data. After a fix, rerun the affected scenario and record the new date.

Worked example

Acceptance testing for a consultation request form

This fictional example uses names, conditions and results solely to illustrate the method.

Excerpt from a practice recording · 12:40
A phone number is required. On successful submission, a request appears in the list and the visitor sees a confirmation. Without a phone number, the form must not submit.

This gives three observable checks: required field validation, request creation and a confirmation shown to the visitor. A polished screen after the click proves only one part.

If the tester cannot access the request list, mark request creation as “blocked.” The presenter’s word alone cannot turn it into a pass.

Submit the formPhone number entered?Yes → request andconfirmationNo → show afield message
The two form paths need different expected results and separate evidence.
ReviewExpected resultEvidence to keep
No phone numberA required-field message appears and no request is createdScreenshot and a check of the list
Valid dataOne request with the values enteredEntry in the test list
Successful submissionClear confirmation for the visitorScreenshot after submission
Ready-to-use template

Template for one acceptance check

Each row should say what observation will determine the final status.

Template for your workSelect and copy
Check ID:
Agreed requirement:
Version / role / environment:
Input data:
Actions:
Expected result:
Actual result:
Status: passed / failed / not tested / blocked
Evidence and timecode:
Related fix:
Retest date:
Result check

Review the checklist before testing

  • Items refer to the agreed scope.
  • The expected result can be seen or measured.
  • The recording and the tester’s own checks are distinguished.
  • Failures have reproducible conditions.
RequirementWhat was agreedDemoWhat was shownReviewWhat was reproducedOutcomeStatus and evidence
Acceptance relies on verified results for a specific version.
Frequently asked questions

A closer look

Should every comment from the meeting go into the checklist?

Separate defects against requirements from new requests. Assess and agree on requests separately so acceptance does not keep expanding the project.

Can we accept the result based on video alone?

That depends on the agreed acceptance rules. Video can provide evidence for the scenario it shows. Record the method and the limits of what was checked.

Keep working with the recording