Write an Architecture Decision Record from a meeting recording
An ADR records one significant architecture decision: its context, alternatives, chosen option, consequences and status. A transcript helps recover the reasoning. Participants verify the technical details.
How to write an Architecture Decision Record from a recorded discussion
An ADR records one significant architecture decision: its context, alternatives, chosen option, consequences and status. A transcript helps recover the reasoning. Participants verify the technical details.
A transcript lets you verify what was said. It preserves context, qualifications and the sequence of the reasoning. The author still needs to decide what the final document says and ask participants to check it.
Write the ADR step by step
Choose one decision
Give each independent architecture decision its own record.
Describe the context
Note the pressures and constraints that made a decision necessary.
Compare the options
For each option, keep the main advantages, disadvantages and reasons for ruling it out.
State the consequences
List benefits, costs, new constraints, risks and what would prompt a review.
Example: choosing how to store audio files
This is a fictional training example. The names, circumstances and outcomes are included solely to explain the method.
“Object storage is cheaper for the archive, but we’ll need a separate mechanism for temporary links.”
Context: the recordings are large, access must expire and link issuance needs controls. The choice is object storage. Cost matters alongside scalability and the access model.
Include the work and risk in the consequences: temporary links, expiry controls, logging and failure tests. If the cost assumption changes, a new ADR can supersede this one while preserving the history.
| Section | Useful entry | What to avoid |
|---|---|---|
| Context | Large files and restricted access | We need new storage |
| Options | Object storage / file storage | We chose the best |
| Decision | Object storage for reasons A and B | The architect decided |
| Consequences | Temporary links and monitoring | No downsides |
ADR template
Copy the template and fill it in using a specific recording. Label unconfirmed assumptions as hypotheses.
Title and status: Date and participants: Context and constraints: Options considered: Decision and reasons: Consequences, risks and review trigger:
Four checks before sending
- The record describes one decision.
- The context includes actual constraints.
- Alternatives and reasons for rejection are recorded.
- Downsides and a review trigger are included.
A closer look
Can we edit an accepted ADR?
You can fix typos. A change to the decision belongs in a new ADR linked to the prior one.
Must the transcript be stored alongside it?
A link to an internal source and timecode is usually enough to check disputed wording.